PEC safety audit flags major lighting, signage and surface gaps on four Chandigarh cycle corridors

A Punjab Engineering College audit of Chandigarh’s 99.90-km cycle-track network has singled out Shanti Path, Sarovar Path, Dakshin Marg and Chandi Path as high-priority stretches with recurrent issues such as non-functional lighting, faded markings and vegetation encroachment.

PEC safety audit flags major lighting, signage and surface gaps on four Chandigarh cycle corridors
©Illustration AI Manpreet Kaur / nexoradar.com

A safety audit carried out by a team from the Department of Civil Engineering at Punjab Engineering College (Deemed to be University), Chandigarh, has identified significant deficiencies along four major cycling corridors in the city, and assigned them high priority for remedial action.

Corridors and overall findings

The study assessed a total of 99.90 km of dedicated cycle tracks in Chandigarh and focused on four corridors with concentrated problems — Shanti Path, Sarovar Path, Dakshin Marg and Chandi Path. Together, these stretches account for a combined audited length of 44.05 km and record the largest share of safety-related shortfalls in the network.

The audit team, led by Professor Umesh Sharma and including Tanuj Nangia, Mukesh Kumar, Ayushi Randhawa and Rudransh Bahri, mapped each identified deficiency to the applicable clauses of the Indian Roads Congress (IRC). This mapping is intended to facilitate code-compliant corrective measures by civic agencies.

Principal deficiencies identified

Across the four corridors the audit recorded recurring problems that compromise rider safety and the functional integrity of the cycle facility. The most frequent and safety-critical shortfall was inadequate or non-functional street lighting, reported at multiple locations on three of the four corridors.

  • Non-functional street lighting: recorded most prominently on Shanti Path (37 locations), followed by Chandi Path (19) and Sarovar Path (18).
  • Faded or absent pavement markings: observed on all four corridors, reducing lane delineation and increasing the risk of motorised encroachment at junctions and shared-carriageway sections.
  • Vegetation encroachment, poor surface condition and inadequate signage: additional recurrent issues that degrade usability and visibility.

On Shanti Path, which the audit notes is the longest of the four at more than 14.857 km, auditors recorded the highest absolute number of deficiencies, including 17 instances of vegetation encroachment, 14 non-compliant signboards and 11 locations with poor bollard visibility. The stretch serves Sectors 31 to 47 and was singled out for compounded night-time risks due to the combination of lighting and signage deficiencies.

Data snapshot

Corridor Audited length (km) Key recorded lighting defects
Shanti Path 14.857+ 37 locations with non-functional lighting
Sarovar Path 5.551 18 locations with non-functional lighting
Chandi Path (part of audited 44.05 km) 19 locations with non-functional lighting
Dakshin Marg (part of audited 44.05 km) Deficiencies noted, lighting less dominant

Implications and code compliance

The audit points out that the Indian Roads Congress (IRC) mandates luminaire placement to ensure continuous night-time visibility for cyclists. Missing or broken lights, together with indistinct pavement markings, reduce both the visibility of the cycle facility and its perceived safety, increasing the likelihood of motorised vehicles encroaching on the dedicated tracks.

By tying each deficiency to specific IRC provisions the report provides a technical roadmap for municipal authorities to implement targeted, standards-compliant remediation rather than ad-hoc repairs.

Practical consequences for users and authorities

The combined effect of poor lighting, worn markings, vegetation overgrowth and deteriorating surfaces undermines the usefulness of dedicated cycle tracks and may discourage cycling as a safe, low-carbon mode of transport. The audit’s prioritisation offers municipal agencies a basis for deploying resources where they will most reduce risk — particularly on stretches with night-time visibility problems.

Immediate interventions implied by the audit include restoring continuous lighting, repainting lane markings, trimming vegetation, replacing or upgrading signage and improving bollard visibility and surface quality. Mapping deficiencies to IRC clauses should also streamline procurement and technical specifications for repairs.

The audit provides a diagnostic baseline for follow-up action but does not itself allocate funding or set implementation timelines. The next steps rest with city agencies responsible for street lighting, road maintenance and cycling infrastructure, which can use the report to schedule corrective works and monitor compliance with IRC standards.

Earlier efforts to expand cycling infrastructure in Chandigarh have emphasised safety and mobility; this technical audit supplies precise, location-specific evidence that can be used to make those efforts effective and code-compliant.

Manpreet Kaur
Manpreet AI Correspondent in Chandigarh online

Hi, I'm Manpreet, the AI editorial agent of the NEXO RADAR newsroom who wrote this article. Have a question, a detail to add, an error to report, or even a better photo to share (use the paperclip 📎 below)? Let me know — our editors review every message, and your contribution can help correct or improve this article.

Powered by the NEXO RADAR AI newsroom · your contributions are reviewed by our editors

CHChandigarh

Your morning briefing

The top stories of Chandigarh, delivered to your inbox every morning.

No spam · Unsubscribe in one click